The challenge of construction supply chain management is to maintain supply and demand in the supply chain flow and ensure a sustainable supply chain in the framework of lean construction. This challenge must be captured as part of the solution of the development of the rapidly growing construction industry. At present a sustainableSCOR on the Supply Chain Operations Reference (SCOR) version 12.0 has been developed. SustainableSCOR is a concept of a sustainable supply chain performance measurement approach by considering environmental aspects. The aim of this study is to adopt a supply chain performance measurement model in the sustainable construction of SCOR 12.0. The research method adopts standards, categories, and matrices in sustainableSCOR to a constructionally validated definition to academics and practitioners. The discussion of the supply chain continues with the calculation of each matrix. The results showed that all sustainableSCOR categories, namely materials, recycled inputs, recovered inputs, energy, water, emissions, and waste can be adopted to measure sustainable supply chain performance in construction. The adoption of this performance measurement needs to be detailed into one of the construction materials, in this study is steel material.

References


Andrejs, G., Rizoto-Vidala-Pesoa, L. M., & Kuzņecova, O. (2018). Implementation of SCOR Based Business Process Implementation of SCOR Based Business Process Framework for Logistics and Supply Chain in Retail Company. Information Technology & Management Science, 21.

Astana, I. N. Y. (2007). Perencanaan persediaan bahan baku berdasarkan metode MRP (Material Requirements Planning). Jurnal Ilmiah Teknik Sipil, 11(2), 184–194.

Broft, R. D., & Koskela, L. (2018). Supply chain management in construction from a production theory perspective. In 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction-Towards Mature Production Across Cultures and Frontiers (pp. 271–281).

Georgise, F. B., Thoben, K.-D., & Seifert, M. (2016). Adapting the SCOR Model Deliver and Source Processes for the Manufacturing Firms in the Developing Countries. In Dynamics in Logistics (pp. 521–531).

Initiative, G. R. (2016). GRI standards.

Mainah, M. (2019). Analisa Kontrak Kerja Konstruksi Pada Proyek Rehab Bengkel untuk Ruang Widyaiswara, Penyuluh dan Lab IT di Dinas Pangan, Tanaman Pangan dan Hortikultura Kalimantan Timur. Karya S Jurnal Mahasiswa, 1(1), 806–817.

Pujawan, I. N. (2005). Supply Chain Management.

Sholeh, M. N., & Wibowo, M. A. (2015). Aplikasi Rantai Pasok: Pengadaan Material Konstruksi Antar Pulau. Proceeding SENDI_U, 978–979.

Sukati, I., Bakar, A., Baharun, R., & Yusoff, R. (2012). The Study of Supply Chain Management Strategy and Practices on Supply Chain Performance. Procedia - Social and Behavioral Sciences, 40, 225–233.

Supply Chain Council. (2012). Supply Chain Operations Reference Model. Supply Chain Operations Management, 1–976.

Wibowo, M. A., & Sholeh, M. N. (2015). The analysis of supply chain performance measurement at construction project. Procedia Engineering, 125, 25–31.




DOI: http://dx.doi.org/10.7454/jvi.v8i2.159

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 Unported License.

View My Stats